I need human help to enter verification code (office hours only)

Sign In Forgot Password

Habonim's New Home: Drawings and Photos  

Return to main New Building page

Drawings of our new home       Construction photos 

Drawings of our new home

Exterior

Renderings of the western half of the exterior of Congregation Habonim. 

Facing west:

 

 

                     

 

 

Facing east:

 

 

 

 

Viewed at night:

Eastern half of our 65th Street facade:

The eastern end of the exterior is the outside wall of our chapel; stained glass designs from our old home will be visible from 65th Street on that end of the exterior. 

Sanctuary

Social Hall

Chapel

Chapel view north

Lounge

Lower Level Coat Room/Bridal Room

Photos of our new home under construction (oldest photos at bottom)

August 2025 - Our facade on 65th Street is continuing to take shape (behind scaffolding if you are walking down the street, but you can peer into small windows to see it).

The canopy on our exterior is being completed:

To the east of the front doors, the exterior surrounding the office windows:

The view from just inside our front doors:

Our passenger elevator has been installed:

The large, high-ceiling, column-free location of our sanctuary:

The large, high-ceiling, column-free location of our social hall:

May 2025

On the western half of the facade, you can now see glass in the windows, the light gray material has been placed above the windows, and the structure of the canopy is in place above the windows:

Looking from east to west, you can see the full structure of the canopy above the windows:

Looking at the center of the facade, you can see our front doors in place under the canopy structure:

Just east of the canopy and front doors, you can now see the office windows and the surrounding external material being put into place:

    

Nov 2024 - The wall of the western half of our exterior facade has been constructed on 65th Street (it is behind scaffolding if you are walking down the street). You can see the distinctive outline of the wall and the space for the windows in the photo and the rendering here:

The wood area is where our front door will be, as seen in this photo and rendering:

   

The view from inside - from the back of the sanctuary towards 65th Street:

The lower level of our space is largely cleared out of building construction activity:

 Looking north from social hall to kitchen area   Looking south at social hall area

May 2024 - view from middle of our space, looking a) southeast (towards chapel), b) south (towards front door), and c) southwest (towards sanctuary). The photos were taken looking south from the vantage point of approximately where our 4th classroom will be. You can see that the space is still filled with the overall building's construction equipment and material.

        

November 2022 - Sanctuary site and social hall site

   

November 2022 - Look down our main staircase to our lower level

    

November 2022 - site of our kitchen

September 2022 - View north at our outdoor space from chapel area and site of the northernmost classrooms approaching 66th Street.

    

June 2019 - before the ground floor was put in place, view into our lower level space from 65th Street

June 2019 - different angle of the lower level:

April 2019 - view from overhead of foundation, looking west. 

December 2018 - view from overhead of foundation work, looking west. 

July 2018 - foundation being dug out (view from 65th St towards the east - can see the L-shaped outline of our outdoor space, highlighted with a red line, on the easternmost edge of our space)

July 2018 - foundation being dug out (view from 65th St where our sanctuary will be)

Fri, August 15 2025 21 Av 5785